CRUNCH TIME! We leave in a week! I’ve got to get this in to Cummins because it has been starting super hard lately. Before I took it I built an enclosure to hold down the fridge and Microwave and painted them. Finished the Base cabinets and secured the counter top. Built shelving out of the old carpeted mdf from the luggage racks. Set the porta potty in place for the kids to use in an emergency(We have lots of those). Painted the bed frames and used 5mm ply to create a skin and installed some lights for the kids. Secured the bunk beds to the ceiling using one of the pieces of the luggage rack I left in place. That thing is crazy sturdy. Installed an overhead kitchen light. and I’m probably missing a whole bunch more.